Seawork International – Day 3 (16.06.2016)
After three long days Seawork International 2016 is all over for another year, and today was the busiest for the Corilla Marine stand. People flooded to both our stand at SB71 and our water berth VA-09 to learn more about rotationally moulded polyethylene Navigation Buoys and all of the new products that we launched , including our new Marker Buoys and Spar Buoys.
What a fantastic atmosphere throughout the day, we even stopped to watch the Wales vs England football game alongside hundreds of other exhibitors and visitors. Although Wales did lose, the weather over the course of the week was enough to keep our spirits high. 5:30pm came with everyone packing down their stands to leave and load vans, lorries and cars and it’s no surprise that the heavens opened and down came the rain just in time to drench everyone that braved walking with all their belongings.
All in all an amazing week for everyone involved.